Procedure

prosedur pengusulan kek infogrpahics (1024x683)

Brief Description Proposal Procedures

Enterprise

1) Enterprises as proposer apply for the establishment of SEZ by filling out the Proposed Establishment of SEZ was signed by leaders of enterprises and completes all required documents and then conveyed to the Regent / Mayor for approval.

2) Regent / Mayor after receiving the request for the establishment of SEZ assign the Local Government Unit (SKPD) or other work units are designated to inspect documents

3) In the event that the proposed document is not complete, then SKPD or other designated work units delivered to the Regent / Mayor for the return of the proposal document to the Business Entity to include

4) SKPD or other designated work unit, verification and evaluation requirements of the proposed document later than 20 (twenty) working days after the received proposal documents declared complete.

5) In the event that the proposed document is not correct, Regent / Mayor sent a letter of denial to entities that accompanied the reasons for refusal.

6) Enterprises can apply again after fulfilled all required documents to the Regent / Wal Submission of the document proposed by the enterprises and / or refund by the Regent / Mayor may be repeated until all documents are complete.

7) If all the proposed document meets the requirements and stated correctly, Regent / Mayor submit proposals for establishing SEZ from business entities to the Governor. In the proposed incentive plan is also accompanied, among others, in the form of exemption or relief on local taxes and levies as well as ease by District / City Government.

 

 

8) Governor after receiving the request for the establishment of the KEK Regent / Mayor shall assign the Local Government Unit (SKPD) or other work units are designated to inspect documents.

9) In the event that the proposed document is not complete, then SKPD or other work units are designated to convey to the Governor for the return of the proposal document to the Business Entity to be equipped with Regent / Mayor.

10) SKPD or other designated work unit, verification and evaluation requirements of the proposed document later than 20 (twenty) working days after the received proposal documents declared complete.

11) In the event that the proposed document is not correct, the governor submitted a letter of denial to enterprises through Regent / Mayor.

12) Enterprises can apply again after fulfilled all required documents through Regent / Wal Submission of the document proposed by the enterprises and / or refund by the Governor may be repeated until all documents are complete.

13) If all the proposed document meets the requirements and correctly stated, the Governor delivered the proposal to establish KEK from enterprises to the Chairman of the National Council through the Secretary of the National Council. In the proposal may also be accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by the Provincial Government.

 

14) The Secretary of the National Council undertake the verification and evaluation of the nomination documents according to the requirements prescribed maximum of 10 (ten) days.

15) In the event that the proposed document is not complete, then Secretary of the National Council delivered to the Governor for the return of the document proposed to

16) In the case of the document proposing the establishment of SEZ of Governors has completed the requirements, the Secretary of the National Council convey to the Executive Team to do the assessment.

17) Executive Team is assisted by the Secretary of the National Council will review the proposed establishment of SEZ is 25 (twenty five) working days. Assessment is done, to:

1) fulfillment of the criteria for the location of the SEZ; and

2) The validity and feasibility of the contents of required documents.

18) Implementation Teams may establish a working group to explore the establishment of SEZ proposals by Governor

19) Implementation Team made recommendations based on the results of studies undertaken to be submitted to the Chairman and Members of the National Council

20) The Secretary of the National Council of the National Council meeting scheduled to discuss the recommendations and a review of the Implementation Team for the establishment of SEZ proposals submitted by the Governor.

21) The National Council convened to discuss the recommendations and results of the study carried out by the establishment of SEZ Implementation Team within a period of ten (10) working days after the recommendation received from the Implementation Team.

22) Implementation of the National Council Meeting Regulation of the Coordinating Minister for Economic Affairs as Chairman of the National Council for Special Economic Zones No. PER-06 / M.EKON / 08/2010 on the Rules and Procedures of Trial Decision of the National Council for Special Economic Zones.

23) In the session of the National Council decided and determined to accept the proposed establishment of the SEZ or reject the proposed establishment of SEZ

24) In the case of the National Council approved the proposal of the establishment of the SEZ, the Chairman of the National Council submitted a recommendation to the President determination KEK accompanied by the Draft Regulation on the establishment of a location as the preparation of Government Regulation on the establishment of a SEZ location as referring to the legislation regarding the establishment of regulations legislation (among others Law Number 12 Year 2011 on the Establishment of Laws and Regulations).

25) In the case of the National Council rejected the establishment of SEZs, the rejection was delivered by the Chairman of the National Council to the Governor of the proposer, along with the reasons for refusal.

26) The President, considering the recommendation of the National Council , establishes the Draft Regulation on the establishment of a location as KEK into Government Regulation

27) Based on Government Regulation which establishes KEK, Chairman of the National Council delivered to the governor to make the process of implementation of the SEZ development in accordance with the provisions of the legislation. In the development process, the formation of the Board of Governors to prepare proposals were submitted to the Chairman of the Region of the National Council.

BU Cross district.

1) Enterprises as proposer apply for the establishment of SEZ by filling out the Proposed Establishment of SEZ was signed by leaders of enterprises and completes all required documents and then conveyed to the Governor for approval.

2) Governor after receiving the request for the establishment of business entities commissioned KEK SKPD or other work units are designated to inspect documents.

3) In the event that the proposed document is not complete, then SKPD or other work units are designated to convey to the Governor for the return of the proposal document to the Business Entity to be equipped.

4) Enterprises can apply again after fulfilled all required documents. Submission of the document proposed by the enterprises and / or refund by the Governor may be repeated until all documents are complete.

5) In the event that the proposed document is not correct, the governor submitted a letter of denial to Enterprises.

6) The Governor shall submit the proposed establishment of the SEZ to the Regent / Mayor of the territory proposed to be designated as an SEZ.

7) Each of the Regent / Mayor whose territory proposed to be designated as KEK, Regent / Mayor shall assign the Local Government Unit (SKPD) or other work units are designated to carry out the verification and evaluation of the documents later than 20 (twenty) working days.

8) Based on the verification and evaluation performed by SKPD documents or other designated work unit, Regent / Mayor convey to the Governor regarding the approval or rejection of the establishment of SEZ in the region.

9) In the case of Regent / Mayor rejects the establishment of SEZ in the region, then the rejection accompanied by reasons.

10) In the case of Regent / Mayor approved the establishment of SEZs, the submission of approval accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by District / City Government.

 

 

11) If all the proposed document meets the requirements and is declared correctly and have the approval of their respective dri Regent / Mayor, Governor said the proposed establishment of the SEZ from business entities to the Chairman of the National Council through the Secretary of the National Council. In the proposal may also be accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by the Provincial Government.

 

12) The Secretary of the National Council of verification and evaluation of the nomination documents according to the requirements specified later than ten (10) working days.

13) In the event that the proposed document is not complete, then Secretary of the National Council delivered to the Governor’s proposal to include the return of documents.

14) In the case of the document proposing the establishment of SEZ of Governors has completed the requirements, the Secretary of the National Council convey to the Executive Team to do the assessment.

15) Executive Team is assisted by the Secretary of the National Council will review the proposed establishment of SEZ is 25 (twenty five) working days. Assessment is done, to:

a) fulfillment of the criteria for the location of the SEZ; and

b) truth and feasibility contents required documents.

16) Implementation Teams may establish a working group to explore the establishment of SEZ proposal by the Governor.

17) Implementation Team made recommendations based on the results of studies undertaken to be submitted to the Chairman and Members of the National Council.

18) Recommendations Implementation Team submitted to the Chairman and Board Members
National

19) The Secretary of the National Council of the National Council meeting scheduled to discuss the recommendations and a review of the Implementation Team for the establishment of SEZ proposals submitted by the Governor.

20) The National Council convened to discuss the recommendations and results of the study carried out by the establishment of SEZ Implementation Team within a period of ten (10) working days after the recommendation received from the Implementation Team.

21) Implementation of the National Council Meeting Regulation of the Coordinating Minister for Economic Affairs as Chairman of the National Council for Special Economic Zones No. PER-06 / M.EKON / 08/2010 on the Rules and Procedures of Trial Decision of the National Council for Special Economic Zones.

22) In the session of the National Council decided and determined to accept the proposed establishment of the SEZ or reject the proposed establishment of the SEZ.

23) In the case of the National Council approved the proposal of the establishment of the SEZ, the Chairman of the National Council submitted a recommendation to the President determination KEK accompanied by the Draft Regulation on the establishment of a location as KEK. Preparation of Government Regulation on the establishment of a SEZ location as referring to the legislation regarding the establishment of laws and regulations (among others Law Number 12 Year 2011 on the Establishment of Laws and Regulations).

24) In the case of the National Council rejected the establishment of SEZs, the rejection was delivered by the Chairman of the National Council to the Governor of the proposer, along with the reasons for refusal.
President on the recommendation of the National Council establishes the Draft Regulation on the establishment of a location as KEK into government regulation.

25) Based on Government Regulation which establishes KEK, Chairman of the National Council delivered to the governor to make the process of implementation of the SEZ development in accordance with the provisions of the legislation. In the development process, the formation of the Board of Governors to prepare proposals were submitted to the Chairman of the Region of the National Council.

Kab. / City

1) Regent / Mayor expressed the proposed establishment of the SEZ to the Governor who accompanied all required documents and plan the provision of incentives in the form of exemption or reduction of local taxes and levies as well as ease by District / City Government.

2) Governor after receiving the request for the establishment of the KEK Regent / Mayor assign SKPD or other work units are designated to inspect documents.

3) In the event that the proposed document is not complete, then SKPD or other work units are designated to convey to the Governor for the return of the proposal document to the Business Entity to be equipped with Regent / Mayor.

4) SKPD or other designated work unit, verification and evaluation requirements of the proposed document later than 20 (twenty) working days after the received proposal documents declared complete.

5) In the event that the proposed document is not correct, the governor submitted a letter of denial to enterprises through Regent / Mayor.

6) Regent / Mayor may resubmit the nomination of establishment of SEZ after fulfilled all required documents. Submission of documents proposed by Regency / City as well as the return by the Governor may be repeated until all documents are complete.

7) If all the proposed document meets the requirements and correctly stated, the Governor delivered the proposal to establish KEK of Regency / City from the Chairman of the National Council through the Secretary of the National Council. In the proposal may also be accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by the Provincial Government.

 

8) The Secretary of the National Council of verification and evaluation of the nomination documents according to the requirements specified later than ten (10) working days.

9) In the event that the proposed document is not complete, then Secretary of the National Council delivered to the Governor’s proposal to include the return of documents.

10) In the case of the document proposing the establishment of SEZ of Governors has completed the requirements, the Secretary of the National Council convey to the Executive Team to do the assessment.

11) Executive Team is assisted by the Secretary of the National Council will review the proposed establishment of SEZ is 25 (twenty five) working days. Assessment is done, to:

a) fulfillment of the criteria for the location of the SEZ; and

b) truth and feasibility contents required documents.

12) Implementation Teams may establish a working group to explore the establishment of SEZ proposal by the Governor.

13) Implementation Team made recommendations based on the results of studies undertaken to be submitted to the Chairman and Members of the National Council.

14) Recommendations Implementation Team submitted to the Chairman and Board Members
National

15) The Secretary of the National Council of the National Council meeting scheduled to discuss the recommendations and a review of the Implementation Team for the establishment of SEZ proposals submitted by the Governor.

16) The National Council convened to discuss the recommendations and results of the study carried out by the establishment of SEZ Implementation Team within a period of ten (10) working days after the recommendation received from the Implementation Team.

17) Implementation of the National Council Meeting Regulation of the Coordinating Minister for Economic Affairs as Chairman of the National Council for Special Economic Zones No. PER-06 / M.EKON / 08/2010 on the Rules and Procedures of Trial Decision of the National Council for Special Economic Zones.

18) In the session of the National Council decided and determined to accept the proposed establishment of the SEZ or reject the proposed establishment of the SEZ.

19) In the case of the National Council approved the proposal of the establishment of the SEZ, the Chairman of the National Council penetepan KEK submitted a recommendation to the President, accompanied by the Draft Regulation on the establishment of a location as KEK. Preparation of Government Regulation on the establishment of a SEZ location as referring to the legislation regarding the establishment of laws and regulations (among others Law Number 12 Year 2011 on the Establishment of Laws and Regulations).

20) In the case of the National Council rejected the establishment of SEZs, the rejection was delivered by the Chairman of the National Council to the Governor of the proposer, along with the reasons for refusal.

21) The President on the recommendation of the National Council establishes the Draft Regulation on the establishment of a location as KEK into government regulation.

22) Based on Government Regulation which establishes KEK, Chairman of the National Council delivered to the governor to make the process of implementation of the SEZ development in accordance with the provisions of the legislation. In the development process, the formation of the Board of Governors to prepare proposals were submitted to the Chairman of the Region of the National Council.

province

1) The Governor said the proposed establishment of the SEZ to the Regent / Mayor of the territory proposed to be designated as an SEZ.

2) Each of the Regent / Mayor whose territory proposed to be designated as a KEK assigned SKPD or other work units are designated to verify maximum of 20 (twenty) working days.

3) Based on the verification carried out by SKPD or other designated work unit,

Regent / Mayor convey to the Governor regarding the approval or rejection of the establishment of SEZ in the region.

4) In the case of Regent / Mayor rejects the establishment of SEZ in the region, then the rejection accompanied by reasons.

5) In the case of Regent / Mayor approved the establishment of SEZs, the submission of approval accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by District / City

6) If all the proposed document meets the requirements and is declared correctly and has the approval of each regent / mayor, governor submit proposals for establishing SEZs Chairman of the National Council through the Secretary of the National Council. In the proposal may also be accompanied incentive plan in the form of exemption or relief on local taxes and levies as well as ease by the Provincial Government.

 

7) The Secretary of the National Council undertake the verification and evaluation of the nomination documents according to the requirements specified later than ten (10) working days.

8) In the event that the proposed document is not complete, then Secretary of the National Council delivered to the Governor’s proposal to include the return of documents.

9) In the case of the document proposing the establishment of SEZ of Governors has completed the requirements, the Secretary of the National Council convey to the Executive Team to do the assessment.

Implementing

10)Team assisted by the Secretary of the National Council will review the proposed establishment of SEZ is 25 (twenty five) working days. Assessment is done, to:

a) fulfillment of the criteria for the location of the SEZ; and

b) truth and feasibility contents required documents.

Implementation 11.Tim can form a working group to explore the establishment of SEZ proposal by the Governor.

12) Team draw up recommendations based on the results of studies undertaken to be submitted to the Chairman and Members of the National Council.

13) Recommendation of Implementation Team submitted to the Chairman and Members of the National Council

14) Secretary of National Council in  National Council meeting scheduled to discuss the recommendations and a review of the Implementation Team for the establishment of SEZ proposals submitted by the Governor.

15) National Council hold a session to discuss the recommendations and results of the study carried out by the establishment of SEZ Implementation Team within a period of ten (10) working days after the recommendation received from the Implementation Team.

16) National Council Meeting of Regulation of the Coordinating Minister for Economic Affairs as Chairman of the National Council for Special Economic Zones No. PER-06 / M.EKON / 08/2010 on the Rules of Procedure of Hearing and Decision of the National Council for Special Economic Zones.

17) In assembly and the National Council decided to accept the proposal to establish a set of SEZ or reject the proposed establishment of the SEZ.

18) In terms of the National Council approved the proposal of the establishment of the SEZ, the Chairman of the National Council submitted a recommendation to the President determination KEK accompanied by the Draft Regulation on the establishment of a location as KEK. Preparation of Government Regulation on the establishment of a SEZ location as referring to the legislation regarding the establishment of laws and regulations (among others Law Number 12 Year 2011 on the Establishment of Laws and Regulations).

19) In case the National Council rejected the establishment of SEZs, the rejection was delivered by the Chairman of the National Council to the Governor of the proposer, along with the reasons for refusal.

20) President based on the recommendation of the National Council establishes the Draft Regulation on the establishment of a location as KEK into government regulation.

21. Regarding to government regulation which sets KEK, Chairman of the National Council delivered to the governor to make the process of implementation of the SEZ development in accordance with the provisions of the legislation. Dala development process, the Governor of preparing the proposed establishment of the Zone Council submitted to the Chairman of the National Council.

Ministry / LPNK

1) Minister / Head of Non-Government Institutions (LPNK) submit proposals to the Governor for the establishment of SEZ in the region. Governor coordinate plans KEK formation with Regent / Mayor that partly proposed to be designated as KEK. (Download Form Proposed Establishment of KEK)

2) Each of the Regent / Mayor whose territory proposed to be designated as KEK, submit responses and / or approval to the Governor. In the agreement also accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by District / City

3) In coordination with the Regent / Mayor, Governor submit responses and / or approval of the establishment of SEZ in the territory in which accompanied incentive plan in the form of exemption or reduction of local taxes and levies as well as ease by the Provincial Government and District / City Government.

4) Minister / Head LPNK based responses and / or the approval of the Governor to convey the proposed establishment of the SEZ to the Chairman of the National Council through the Secretary of the National Council.

5) The Secretary of the National Council undertake the verification and evaluation of the nomination documents according to the requirements specified later than ten (10) working days.

6) In the event that the proposed document is not complete, then Secretary of the National Council delivered to the Minister / Head LPNK proposal for the return of the document to be equipped.

7) In the case of the document proposing the establishment of SEZ of the Minister / Head LPNK have completed the requirements, the Secretary of the National Council convey to the Executive Team to do the assessment.

8) Executive Team is assisted by the Secretary of the National Council will review the proposed establishment of SEZ is 25 (twenty five) working days. Assessment is done, to:

a) fulfillment of the criteria for the location of the SEZ; and

b) truth and feasibility contents required documents.

9) Implementation Team can form a working group to explore the establishment of SEZ proposal by the Governor.

Implementing 10.Tim draw up recommendations based on the results of studies undertaken to be submitted to the Chairman and Members of the National Council.

11) Recommendation of  Implementation Team submitted to the Chairman and Board Members
National

12) Secretary of National Council  in National Council meeting scheduled to discuss the recommendations and a review of the Implementation Team for the establishment of SEZ proposals submitted by the Governor.

13) National Council hold a session to discuss the recommendations and results of the study carried out by the establishment of SEZ Implementation Team within a period of ten (10) working days after the recommendation received from the Implementation Team.

14) National Council meeting is Regulation of the Coordinating Minister for Economic Affairs as Chairman of the National Council for Special Economic Zones No. PER-06 / M.EKON / 08/2010 on the Rules of Procedure of Hearing and Decision of the National Council for Special Economic Zones.

15) In Assembly and the National Council decided to accept the proposal to establish a set of SEZ or reject the proposed establishment of the SEZ.

16) In terms of the National Council approved the proposal of the establishment of the SEZ, the Chairman of the National Council submitted a recommendation to the President determination KEK accompanied by the Draft Regulation on the establishment of a location as KEK. Preparation of Government Regulation on the establishment of a SEZ location as referring to the legislation regarding the establishment of laws and regulations (among others Law Number 12 Year 2011 on the Establishment of Laws and Regulations).

17)  In case the National Council rejected the establishment of SEZs, the rejection was delivered by the Chairman of the National Council to the Minister / Head of LPNK proposer, along with the reasons for refusal.

18) Presiden based on the recommendation of the National Council establishes the Draft Regulation on the establishment of a location as KEK into government regulation.

19) Based government regulation which sets KEK, Chairman of the National Council delivered to the Minister / Head LPNK to make the process of implementation of the SEZ development in accordance with the provisions of the legislation which coordinate with the governor. In the development process, the formation of the Board of Governors to prepare proposals were submitted to the Chairman of the Region of the National Council.